Heritage Lane, 80 Anne St Brisbane QLD
Architect: Woods Bagot
Builder: Mirvac
Hydraulics Subcontractor: Boone and Willard
Tenant: Suncorp
Product: Hydrao Cereus – SMART shower head
Supplied: June 2021
The Cereus shower head was specified for the end of transit showers. All shower heads can be linked by an app for the facility manager to record/manage the use of water for showering. Individual users can also use an app on their smartphone to track their personal water usage.
- WELL Core and Shell Gold certification
- 6 Star Green Star – Design and As Built – Office
- 5 Star NABERS Energy – Base Building
- 4 Star NABERS Water – Whole Building
Distribution Centre Lidcombe NSW
Size: 99kW
Installed: May 2021
This busy Distribution Centre has started the road to sustainability by installing the first of 6 systems after consultation with Green Specifier. The first step was reducing power consumption by installing LED lights throughout the warehouses and identifying other areas electricity usage could be reduced.
Distribution Centre Lidcombe NSW
Product: LED Warehouse Lighting – Internal and External
Installed: May 2020
Installation of LED High Bay lights throughout warehouses and outside with LED floodlighting.
Our process for helping companies to achieve carbon neutrality is to identify, measure, reduce and then offset. This DC aims to be 100% self-sufficient for electricity by the installation of a large solar power station with battery storage by 2022.
Green Specifier is helping this large national company on its road to carbon neutrality.